402, ANIKETC.G. Road, Ahmedabad

+91 79 2646 1940
drashta@drashtapower.com

36 MW MFL CPP moving ahead swiftly

19-02-2019

 36 MW Captive Power Project (CPP) of Meghmani Fine chem Limited (MFL), Dahej is moving ahead very quickly. The project is being executed with ThyssenKrupp Industries (tKII) under EPC mode.
 
The important equipment of the project are

    180 TPH CFBC Boiler with Steam parameters at 110 Kg /Cm2 (a) & 540 Degree C
    36 MW Siemens Steam Turbine
    Water Cooled Condenser